Valves put in place. Side panels not glued yet |
As the organ is constructed with natural materials, I found it appropriate to use natural tools too ;-) Side panels are drying |
Side panel glued with wood glue. They were screwed which was not as designed originaly. So I omitted the screws |
Side panels dryed |
Valve lever positioned and checked for good operation |
Lever mounted and fixed. |
The unit before it could be mounted in the organ |
Some guides needed to be fixed first before the unit can slide back into the organ |
Geen opmerkingen:
Een reactie posten